These are the IPT's we have established as of Saturday 9/14.
For those interested in SolidWORKS, which is encouraged, go to the Resources Page and find the SolidWORKS link. People have learned this in an hour; If you have time, go for this, as it can definitely been more efficient and accurate than making a scaled drawing.
Also, make a page for each of these IPT's on this wikispaces page and link it next to the name of the IPT.
These are the requirements for each IPT:
1) Mass, in excel
2) Dimensions
3) Scaled drawing and/or...
4) CAD (encouraged)
5)Analysis of Capability (Requirements, Physics Calculations)
We will have a status meeting Thursday, 9/19, at Jordan. Be very close to finished with all of these requirements by then. On Friday, 9/20, your finished product is due; meeting at Jordan!!! Be prepared for Analysis of Alternatives.
These are the IPT's we have established as of Saturday 9/14.
For those interested in SolidWORKS, which is encouraged, go to the Resources Page and find the SolidWORKS link. People have learned this in an hour; If you have time, go for this, as it can definitely been more efficient and accurate than making a scaled drawing.
Also, make a page for each of these IPT's on this wikispaces page and link it next to the name of the IPT.
These are the requirements for each IPT:
1) Mass, in excel
2) Dimensions
3) Scaled drawing and/or...
4) CAD (encouraged)
5)Analysis of Capability (Requirements, Physics Calculations)
6) Materials
Reference:
Weights and Measurements
We will have a status meeting Thursday, 9/19, at Jordan. Be very close to finished with all of these requirements by then. On Friday, 9/20, your finished product is due; meeting at Jordan!!! Be prepared for Analysis of Alternatives.
Claw:
2-item claw: PJ, Wil, Zhong
1-item claw: Megan, Joshua
static claw/hook: Jon
other: Pooja
Arm:
igus-sliding arm: Joseph, Brandon
multi-elbow arm: Farita, Mustafa Multiple Elbow Arm
wheel slider arm: David
telescoping screw: Adams
Base:
rotating base: Galen, Godwin
static/elevated base: Jerry
other: John
Goals and Deadlines:
Base:
First Deadline: Saturday 9/28
Validate DesignBuild prototype
Test and tweak
Second Deadline: Friday 10/4
Build final baseArm:
First Deadline: Saturday 9/28
Validate DesignBuild prototype
Test and tweak
Second Deadline: Friday 10/4
Build final armClaw:
First Deadline: Saturday 9/28
Validate DesignBuild group of servos
Prototype claw
Test and tweak
Second Deadline: Friday 10/4
Build final clawDeadline for Integration of entire robot: Saturday 10/5
Practice/Program: two weeks, until Saturday 10/19